The cockpit of a grounded Lion Air Boeing Co. 737 Max 8 aircraft. (Bloomberg photo by Dimas Ardian)

Boeing cutting production rate of troubled 737 Max jet

Boeing faces a growing number of lawsuits filed by families of the victims

Boeing will cut production of its troubled 737 Max airliner this month, underscoring the growing financial risk it faces the longer that its bestselling plane remains grounded after two deadly crashes.

The company said Friday that starting in mid-April it will cut production of the plane to 42 from 52 planes per month so it can focus its attention on fixing the flight-control software that has been implicated in the crashes.

The move was not a complete surprise. Boeing had already suspended deliveries of the Max last month after regulators around the world grounded the jet.

Preliminary reports into accidents in Indonesia and Ethiopia found that faulty sensor readings erroneously triggered an anti-stall system that pushed the plane’s nose down. Pilots of each plane struggled in vain to regain control over the automated system.

In all, 346 people died in the crashes. Boeing faces a growing number of lawsuits filed by families of the victims.

Boeing also announced it is creating a special board committee to review airplane design and development.

READ MORE: Canada bans Boeing 737 Max 8 plane following fatal Ethiopian crash

The announcement to cut production comes after Boeing acknowledged that a second software issue has emerged that needs fixing on the Max — a discovery that explained why the aircraft maker had pushed back its ambitious schedule for getting the planes back in the air.

A Boeing spokesman called it a “relatively minor issue” and said the plane maker already has a fix in the works. He said the latest issue is not part of flight-control software called MCAS that Boeing has been working to upgrade since the first crash.

Chairman and CEO Dennis Muilenburg described the production cut as temporary and a response to the suspension of Max deliveries.

Boeing has delivered fewer than 400 Max jets but has a backlog of more than 4,600 unfilled orders. The Chicago-based company had hoped to expand Max production this year to 57 planes a month.

Indonesia’s Garuda Airlines has said it will cancel an order for 49 Max jets. Other airlines, including Lion Air, whose Max 8 crashed off the coast of Indonesia on Oct. 29, have raised the possibility of cancelling.

A Boeing official said Friday’s announcement about cutting production was not due to potential cancellations. The official spoke on condition of anonymity because Boeing does not publicly discuss those details.

In a statement, Muilenburg said the reduction was designed to keep a healthy production system and maintain current employment — in effect, slowing down production now to avoid a deeper cut later, if fixing the plane takes longer than expected.

Analysts say the absence of deliveries will eat into Boeing’s cash flow because it gets most of the cost of a plane upon delivery.

Boeing declined to provide figures, but undelivered Max jets have been stacking up at its Renton, Washington, assembly plant.

Airlines that operate the Max will be squeezed the longer the planes are grounded, particularly if the interruption extends into the peak summer travel season.

They could buy used 737s, but that would be costly because the comparably sized Boeing 737-800 was very popular and in short supply even before the Max problems, according to Jim Williams, publisher of Airfax, a newsletter that tracks transactions involving commercial aircraft.

Williams said that if the Max grounding appears likely to extend into summer it will cause airlines to explore short-term leases, which could push lease rates higher, something that airline analysts say is already happening.

Boeing shares closed at $391.93, down $3.93. In after-hours after news of the production cut, they slipped another $8.98, or 2.3%, to $382.85.

David Koenig, The Associated Press

Like us on Facebook and follow us on Twitter.

Just Posted

Ridge Jr. B Flames making additions

Four players sign, two coaches join mix.

UPDATE: Two-vehicle incident on Abernethy Way, Maple Ridge

Road near 227th Street reopens in both directions.

Maple Ridge elementary protest to protect against climate change

Grade 7 Albion students march in front of municipal hall.

Maple Ridge teacher celebrated as inclusive education champion

Carissa Keenan teaches at Harry Hooge elementary.

Haney Rotary ups bursary amounts

Total is $19,000 this year, up from $11,000 in 2018.

New airline regulations bring compensation for tarmac delays, over-bookings

Some of the new regulations will roll out in July, while others are expected for December.

Burnaby facility to dispose of 1,500 tonnes of Canada’s trash from Philippines

All 103 containers will be disposed of properly within Canada before the end of the summer

Scheer says it would take Conservatives five years to balance budget

Scheeraccused the Liberal government of spending $79.5 billion of previously unbudgeted funds

Man wants guilty plea revoked in 2012 collision in Abbotsford that killed Chilliwack woman

Michael Larocque was charged in relation to crash that killed Eileen Kleinfelder

High-risk sex offender released into Surrey

Earon Wayne Giles, a Newton “tag-team rapist,” was released from prison Friday and is now living in Surrey

Vancouver woman sexually assaulted after man follows her home; suspect at large

Police are looking for an Asian man in his 40s after the incident on Vancouver’s east side.

B.C. man, 30, arrested for driving his parents’ cars while impaired twice in one day

The Vancouver-area man was arrested after officers caught him driving impaired twice in one day

UPDATE: Vancouver man dies after crash between motorcycle, transport truck

Police believe speed was a factor in Thursday collision

Trial slated to start Monday for accused killer of Abbotsford cop

Oscar Arfmann faces first-degree murder for death of Const. John Davidson

Most Read