Premier John Horgan talks forest policy with Council of Forest Industries CEO Susan Yurkovich at COFI’s convention in Vancouver, April 5, 2019. (COFI)

Museum, hospital expansion to use mass timber, John Horgan says

Premier calls for new strategies for Interior forest companies

The expansion of the Royal B.C. Museum in Victoria and the replacement of St. Paul’s Hospital in Vancouver will showcase the province’s leading role in mass timber construction, Premier John Horgan says.

Speaking to the Council of Forest Industries convention in Vancouver Friday, Horgan referred to his recent visit to Structurlam’s cross-laminated timber factory in Okanagan Falls, where he announced the B.C. Building Code is being changed to increase maximum timber construction height from six storeys to 12.

“Building the new museum from B.C. wood honours the past, while showcasing our bright future in engineered wood design,” Horgan said. “I have asked that the new St. Paul’s use mass timber wherever possible, without affecting building height or view corridors.”

The museum and hospital projects are “just the beginning” for the revitalization of B.C.’s forest industry, Horgan told delegates to B.C.’s largest industry convention. Other public construction projects will also showcase B.C. technology.

READ MORE: Royal B.C. Museum faces space, seismic issues

READ MORE: St. Paul’s Hospital replacement to open in 2026

Horgan described letters he wrote to B.C. Interior forest company executives this week, inviting them to start talks with Indigenous and union leaders on how they can make more efficient use of existing licensed timber supply, which has dropped significantly in the wake of beetle epidemics across the province.

“If we don’t have a transformation from the high-volume to the high-value economy, we’re going to be in trouble,” Horgan told reporters after the speech.

He cited the decision announced by Kalesnikoff Lumber to build a new engineered timber plant in the Kootenays, which came the day after his visit to Structurlam, a pioneer of engineered wood with operations in Penticton and Okanagan Falls.

Structurlam has expanded into the United States, and is supplying mass timber components for a wide variety of projects, including Microsoft’s new campus in Mountain View, California, the heart of Silicon Valley.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Just Posted

UPDATE: One dead after house fire in rural Maple Ridge

Dewdney Trunk Road closed, traffic being re-routed

Salvation Army will help 500-plus students with school supplies

Ridge Meadows Ministries taking registrations and raising funds

Coles-Lyster hits podium during Superweek

Maple Ridge cyclist to compete at Pan American Games

Sands wins another grueling uphill race

Maple Ridge woman holds record for the Grouse Grind

Classic cars on display in Memorial Peace Park in Maple Ridge

Vintage Car Club holds show next to Haney Farmers Market

Rich the Vegan scoots across Canada for the animals

Rich Adams is riding his push scooter across Canada to bring awareness to the dog meat trade in Asia

Canadian high school science courses behind on climate change, says UBC study

Researchers found performance on key areas varies by province and territory

Six inducted into BC Hockey Hall of Fame

The 26th ceremony in Penticton welcomed powerful figures both from on and off the ice

Highway 1 closed near Revelstoke

No estimated time for opening

CRA program to help poor file taxes yields noticeable bump in people helped

Extra money allows volunteer-driven clinics to operate year-round

RCMP investigate two shootings in the Lower Mainland

Incidents happened in Surrey, with a victim being treated at Langley Memorial Hospital

Recall: Certain Pacific oysters may pose threat of paralytic shellfish poisoning

Consumers urged to either return affected packages or throw them out

How a Kamloops-born man helped put us on the moon

Jim Chamberlin did troubleshooting for the Apollo program, which led to its success

Most Read