FILE – This Nov. 3, 2015 file photo shows the Keystone Steele City pumping station, into which the planned Keystone XL pipeline is to connect to, in Steele City, Neb. Pipeline sponsor TC Energy says it has started preliminary work along its route through the U.S. as opponents wait for a judge to rule on their request to block the project. (AP Photo/Nati Harnik, File)

Canadian firm starts US prep work for Keystone XL pipeline

Opponents await a judge’s ruling on their request to block any work

A Canadian company said Wednesday it has started preliminary work along the route of the proposed Keystone XL oil sands pipeline through the U.S. in anticipation of starting construction next month, as opponents await a judge’s ruling on their request to block any work.

TC Energy spokeswoman Sara Rabern said the Calgary-based company was moving equipment this week and will begin mowing and felling trees in areas along the pipeline’s 1,200-mile (1,930-kilometre) route within the next week or so.

The work is planned in Montana, South Dakota and Nebraska, Rabern said. She did not provide further location details.

ALSO READ: U.S. judge blocks construction of $10-billion Keystone XL pipeline

In April the company plans to begin construction at the line’s border crossing in northern Montana. That would be a huge milestone for a project first proposed in 2008 that has since attracted bitter opposition from climate activists who say fossil fuel usage must be curbed to combat global warming.

The company also plans work next month on employee camps in Fallon County, Montana and Haakon County, South Dakota.

Environmental groups in January asked U.S. District Judge Brian Morris to block any work. They said clearing and tree felling along the route would destroy bird and wildlife habitat. The judge in December had denied a request from environmentalists to block construction because no work was immediately planned.

The request by environmentalists came days after the Trump administration approved a right-of-way allowing the $8 billion line to be built across federal land.

ALSO READ: Alberta still pushing for Keystone XL pipeline after U.S. stoppage

“It is irresponsible for TC Energy to jump the gun before Judge Morris rules on our motion,” Stephan Volker, an attorney for the Indigenous Environmental Network and North Coast Rivers Alliance, said Wednesday.

Keystone XL was rejected twice under former President Barack Obama over worries it could make climate change worse.

The pipeline would transport up to 830,000 barrels (35 million gallons) of crude oil daily from western Canada to terminals on the U.S. Gulf Coast.

President Donald Trump has been a strong proponent. The Republican issued a special permit for the pipeline last year after Morris had blocked the project in November 2018, citing potential spills and other environmental concerns.

A legal challenge to Trump’s permit is pending before Morris.

ALSO READ: South Dakota Keystone XL opponents point to N. Dakota spill

Another oil pipeline in TC Energy’s Keystone network in October spilled an estimated 383,000 gallons (1.4 million litres) of oil in eastern North Dakota. Critics say a damaging spill from Keystone XL is inevitable given the length of the line and the many rivers and other waterways it would cross beneath.

Matthew Brown, The Associated Press

Like us on Facebook and follow us on Twitter

Keystone XL

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Ridge Meadows RCMP release year end review video

List detachment’s successes throughout 2019

Maple Ridge and Pitt Meadows issue fire bans

Cities say poor air quality from smoke could further exacerbate current COVID-19 climate

VIDEO: RCMP bring 7 p.m. parade to front doors of Ridge Meadows Hospital

Cruisers with lights and sirens blaring give boost to those working within

WEATHER: Mainly cloudy with a chance of showers

Temperatures to reach a high of 11 C

Intergenerational Garden in Maple Ridge open for another year

All food will be donated to the Friends In Need Food Bank

B.C. records five new COVID-19 deaths, ‘zero chance’ life will return to normal in April

Province continue to have a recovery rate of about 50 per cent

John Horgan extends B.C.’s state of emergency for COVID-19

Premier urges everyone to follow Dr. Bonnie Henry’s advice

B.C.’s first community COVID-19 death was dentist ‘dedicated’ to health: lawyer

Vincent was 64 when he died on March 22 after attending the Pacific Dental Conference

UPDATE: 6.5-magnitude earthquake in Idaho shakes B.C. Interior

An earthquake was reportedly felt just before 5 p.m. throughout the Okanagan

Two inmates at prison housing Robert Pickton test positive for COVID-19

Correctional Service of Canada did not release any details on the identities of the inmates

BC heart surgery patient rarely leaves home

James Jepson is especially vulnerable to the novel coronavirus

BC SPCA launches matching campaign to help vulnerable animals after big donations

Two BC SPCA donors have offered up to $65,000 in matching donations

Quarantined B.C. mom say pandemic has put special-needs families in ‘crisis mode’

Surrey’s Christine Williams shares family’s challenges, strengths

Anti-tax group calls for MPs, senators to donate scheduled pay raises to charity

Bill C-30, adopted 15 years ago, mandates the salary and allowance increases each calendar year

Most Read