Drone photo of Park Bridge completed in 2015 in Kicking Horse Canyon shows challenge of highway widening through the Rocky Mountains. (Ministry of Transportation)

Kicking Horse widening budget up $151 million as bidders invited

Union-only construction adds 5.8% to price of B.C.’s toughest project

B.C.’s transportation ministry is inviting bids to design and build the most difficult highway project in the province’s history, with costs going up, mainly due to union-only construction and engineering changes.

The latest cost estimate for the fourth phase of the Kicking Horse Canyon widening project is $601 million, a $151 million increase since the 2016 project budget. The ministry estimates that $35 million of that is to implement the NDP government’s “community benefits agreement” for public construction projects, requiring worker membership in approved building trades unions.

Other increased costs include additional geotechnical and other engineering work, additional foundation supports for bridges and retaining walls, consultation with Indigenous communities and a bigger contingency fund due to the risk and complexity of the project.

Phase four is four-laning of the final section of Kicking Horse Canyon east of Golden, 4.8 km from West Portal to Yoho Bridge. Construction is slated to begin in the summer of 2020, with completion by the winter of 2023-24.

The cost increase also includes an additional $23 million in interest charges, since the project was initially approved with a $450 million price tag in 2015.

Transportation Minister Claire Trevena emphasized the safety improvement needed in the Kicking Horse Canyon, which has an accident rate three times the average for B.C. highways and areas with effectively no shoulder for vehicles to pull off in an emergency.

RELATED: B.C. Highway 1 widening demanded for decades

RELATED: Single-bridge option chosen for Sicamous section

The average speed for the existing canyon road is 55-65 km/h, causing long backups behind transport trucks and recreational vehicles winding through the scenic route. The objective of the widening is to get the average speed up to 100 km/h as well as enhance safety.

The project will require closure of the Trans Canada Highway from Castle Junction to Golden for an estimated total of 15 weeks. A detour route using Highway 93 and 95 through Radium Hot Springs will add 104 km to the route, approximately an hour and a half of additional travel time.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

LETTER: Verbal attack on foreign workers disturbing

Racist and derogatory comments on social media disheartening and disappointing to Maple Ridge native

LETTER: How about a fashion contest for COVID face gear

Not trying to make light of the pandemic, but how about a community competition, no age limit

ON THE PAGE: FVRL Express launches Monday

It’s as easy as click, pick, and go at Maple Ridge and Pitt Meadows libraries starting next week

LETTER: Doctor calls foul on plea for hazard pay

Dr. Walton doesn’t believe he deserve any thing more for working during COVID

Virtual gala brings dinner to the door and money to locals in need

Maple Ridge Community Foundation is holding a ‘Night In Gala’ fundraiser on June 13

11 new COVID-19 cases in B.C. as top doc urges caution amid ‘encouraging’ low rates

Dr. Bonnie Henry also announced that two care home outbreaks would be declared over

Facing changes together: Your community, your journalists

Thanks for helping The News to continue its mission to provide trusted local news

Police watchdog investigating death of man in Delta

Independent Investigations Office asking for witnesses to May 29 incident at Tsawwassen ferry terminal

Surrey mayor’s party under fire for ‘sickening’ tweet accusing northern B.C. RCMP of murder

Mayor Doug McCallum says tweet, Facebook post ‘sent out by unauthorized person’

Father’s Day Walk Run for prostate cancer will be virtual event this year throughout B.C.

The annual fundraiser for Prostate Cancer Foundation BC has brought in $2.5 million since 1999

Dr. Bonnie Henry announces official ban on overnight kids’ camps this summer

New ban comes after talking with other provincial health officials across the country, Henry says

Senior man in hospital after unprovoked wolf attack near Prince Rupert

Conservation officers are on site looking for the wolf

VIDEO: NASA astronauts blast off into space on SpaceX rocket

Marks NASA’s first human spaceflight launched from U.S. soil in nearly a decade

‘I knew what he wanted’: Kootenay man spends hours in tree as black bear patrols below

Francis Levasseur is no stranger to the outdoors, but a recent run-in with a bear caused quite a scare

Most Read